Greensburg Central Catholic High School
Greensburg, Pennsylvania
Client:
Owner Logo
Diocese of Greensburg
Project Type:
Educational

This project consisted of extensive renovation of a three-story high school. Also included was new construction of a two-story addition housing a new library facility and athletic locker rooms/training areas.

New construction was structural steel frame with masonry walls, slab on grade and composite deck flooring, bar joist and metal deck supporting a rubber roof system. A new HVAC system, electrical distribution system, fire control system, handicap chair lift and elevator were also installed. Interior renovations included new electrical, HVAC, plumbing and fire alarm systems. Finish work included drywall, plaster, acoustical, tile, carpet, millwork, cabinetry, doors, hardware, insulation, painting, etc.

Management Engineering Corporation performed the full scope of construction management services for the owner including:


  • Project Administration
  • Contract Administration
  • Construction Inspection
  • Quality Control onitoring
  • CPM Scheduling
  • Contractor Coordination
  • Design Follow-up Coordination
  • Shop Drawing Approval Coordination
  • Pay Estimate and Cost Control
  • Change Order Negotiation
  • Design Review
  • Value Engineering
  • Final Inspection & Punch List
  • Perform Project Close-out
  • Claims Analysis

Profile End
Related Projects

Additional Projects for: Diocese of Greensburg
Additional Educational Projects

Website designed and maintained by Management Engineering Corporation. All rights reserved.
© 2013 Management Engineering Corporation